Façade Industries can provide both Visual Mock-up (VMU) and Performance Mock-up (PMU) reviews of the drawings and test procedure to ensure both meet AS4284 and are in accordance with the project specification. Reviewing of the independent testing results are reviewed to ensure compliance has been achieved, this is presented in a consolidated report.